Work Breakdown

EMERGIA Work Breakdown

The EMERGIA project is divided into one dissemination and three research work packages.

WP1: Dissemination: Project dissemination activities including web site, scientific publications, press releases, and meetings with experts from SESAR-JU and industry.

WP2: Emergent behaviours of SESAR2020+ ConOps: The objective of WP2 is to identify emergent behaviours at multiple time scales of the SESAR2020+ Concept of Operations in en-route airspace, and to learn understanding the underlying systemic interactions. This delivers draft technical report D2.1 and final technical report D2.2.

WP3: Improvement of SESAR2020+ ConOps: The objective of WP3 is to use differences between emergent behaviours identified for the SESAR2020+ ConOps and the powerful positive emergent behaviours identified for an advanced airborne self-separation ConOps as valuable learning points for the improvement of the SESAR2020+ ConOps. This delivers technical report D3.1.

WP4: Emergent behaviours of the Improved SESAR2020+ ConOps: The objective of WP4 is to identify emergent behaviours at multiple time scales of the Improved SESAR2020+ Concept of Operations in en-route airspace, and to identify the improvements in emergent behaviours relative to SESAR2020+. This delivers draft technical report D4.1 and final technical report D4.2.